March 18, 2002 - More Bathroom Work


Close work being done by the master painter. The DS BR trim gets painted.


The DS BR after trim paint but before chair rail installation.


The DS BR door is partially stripped.


The US BR floor after grouting. The plumber is experiencing delays in obtaining the shower controls.


Same. I think we will go to Lowe's for the shower controls.


More of the same.


The DS BR again showing final color scheme.


The DS BR after the chair rail was installed.


The sink base is installed. The plumbers come on the 22nd to install the toilet and the sink connections.


The door is now fully ready for paint. This will be the final touch. (except for thr radiator.)