March 13-15, 2002


This shows the wallpaper scheme for the DS BR. The papering is about half finished.


The baseboard has been primed. The final color will be a green.


A chair rail molding will separate the two paper patterns.


In the US BR, the wallboard covering the shower framing has started.


Another shot of the tub walls going in.


Same.


Thursday, March 14, 2002, the tile man put in the floor tile in the US BR.


We used antique white and green porcelin tile in a checkerboard pattern.


The grout will be done tomorrow.


This looks good.